I’m working on a project, 3 story building w/ basement.
An existing Fire-Lite MS-4 FACP is programmed for 4 fire zones, (basement, 1st, 2n’d, 3’rd floors)
A new sprinkler system is being added to the building. So my thought is that this existing FACP needs to be replaced with a new FACP which has more zones, to allow for supervisory circuits for the sprinkler system etc.
Is that correct or is there a better way to do it?